|
Aug. 27, 2010 |
|
|---|---|
| Aug 3, 2010 |
The sample data of ASTER are serviced through WMS. KML formatted files are available. Link |
| Jul. 6, 2010 |
|
| Jun. 21-25, 2010 |
|
| Jun. 3, 2010 |
|
| Apr. 16, 2010 |
Hyperspectral survey of the largest impact structure on the Moon by using spectral profiler onboard Kaguya/SELENE: Link1, Link2 |
| Apr. 6, 2010 |
Tsukuba-GAMA 1.0 which is used for GEO Grid user management, has been released. |
| Mar. 23, 2010 |
The PALSAR team of GEO Grid Research group, AIST, performed to set up a corner reflector for the participants of the SIGMA-SAR training session. |
| Jan. 28-Feb. 7, 2010 |
The field campaign for the vicarious calibration of ASTER and the simultaneous observation with the airborne hyperspectral sensor (HyMap) were conducted in collaboration with Australia's Commonwealth Scientific and Industrial Research Organisation (CSIRO) at Western Australia, Australia. |
| Jan. 29, 2010 |
Release: Global Mosaic of Landsat7 WMS Service |
| Jan. 22, 2010 |
PALSAR data have been opened to VO members |
| Nov. 26-27, 2009 |
"Development of ALOS PALSAR data processing system on GEO Grid" |
| Oct. 23, 2009 |
The Moderate Resolution Imaging Spectroradiometer (MODIS) onboard the Terra satellite captured the unseasonable Asian dust spreading over the sea on 19 Oct. It is unusual that the Asian dust is observed domestically in October. GEO Grid Research Group processes the directly broadcasted MODIS data received at SIDaB. |
| Oct. 20-23, 2009 |
"Validation of satellite image with ground sensor network based on OGC web services framework"
|
| Oct. 15-16, 2009 |
GEO Grid presented at AIST Open Lab. |
| Oct. 13, 2009 |
Release: The Quick Estimation System for Earthquake Map Triggered by Observed Records (QuiQuake) |
| Oct. 6, 2009 |
Drs. Tanaka and Nakamura visited Feng Chia University in Taiwan for collaborative study on OGC standard. |
| Sep. 28-Oct. 2, 2009 |
"Seasonal and annual variations derived from estimated velocity of Shirase Glacier flow using ALOS PALSAR data" |
| Sep. 15, 2009 |
Drs. R. Nakamura and S. Kodama contributed to clarify the composition of lunar highland crust. Link |
| Sep. 1-8, 2009 |
The field campaign for the vicarious calibration of ASTER and FORMOSAT-2/RSI was conducted at California and Nevada, USA. |
| Sep. 1, 2009 |
The Moderate Resolution Imaging Spectroradiometer (MODIS) onboard the Terra satellite captured Typhoone No.11 (Krovanh) on 31 Aug. Ice, which is shown in blue purple, formed in the high-altitude well-developed clouds caused by the typhoon. GEO Grid Research Group processes the directly broadcasted MODIS data received at SIDaB. |
| Jul. 27, 2009 |
35th Steering Committee meeting |
| Jun. 22, 2009 |
34th Steering Committee meeting |
| May 21-22, 2009 |
"Cross-polarization observation for ALOS PALSAR calibration" |
| May 20-22, 2009 |
"Utilization of Real-time Data from Sensor Observation for Decision Support System based on OGC Web Services" |
| May 15, 2009 |
33rd Steering Committee meeting |
| Mar. 26, 2009 |
The CR observation for the PALSAR cross-polarization calibration has been started using high-performance dihedral CR. |
| Mar. 24, 2009 |
"Study on Absolute Calibration Coefficient Improvement for ALOS PALSAR Data after Initial Calibration Check" presented by K. Nakamura at Progress In Electromagnetics Research Symposium (PIERS) 2009 in Beijing. |
| Mar. 6, 2009 |
32nd Steering Committee meeting |
| Feb. 26-28, 2009 |
The spectral reflectivity was measured simultaneously with the ASTER observation at the frozen surface on Lake Saroma, Hokkaido. |
| Feb. 15-22, 2009 |
The CR observation for the PALSAR geometric validation was carried out at the frozen surface on Lake Saroma, Hokkaido. |
| Feb. 10-20, 2009 |
Field campaign colaborated with Australia's Commonwealth Scientific and Industrial Research Organisation (CSIRO) at Lake Frome and Lake Lefroy. |
| Feb. 13, 2009 |
The PLASAR CR final observation at AIST field in this fiscal year was safely carried out against the first gale of spring. |
| Feb. 10, 2009 |
K. Iwao presented GEO Grid related activities at the 9th GEO Architecture & Data Committee. held in Kyoto, Japan. |
| Feb, 4-6, 2009 |
K. Iwao and M. Matsuoka exhibited the GEO Grid project at the 3rd GEOSS AP symposium held in Kyoto, Japan. |
| Feb. 1-6, 2009 |
Y.Tanaka and R.Nakamura joined the 8th meeting of |
| Jan. 30, 2009 |
31st Steering Committee meeting |
The GEO Grid is. Learn more...
The GEO Grid provides a framework to provide data sets and to use data. Learn more...
If you wish to manage a new virtual organization. Learn more...




Drs. Nakamura and Matsunaga discovered mantle expousres on the Moon by using KAGUYA/SELENE's hyperspectral data.
"Shirase Glacier outflow estimation using PALSAR image and ASTER DEM"
"Building damage estimation for the 2010 Haiti earthquake using GEO Grid PALSAR"







































